Home    Products & Services     Support
PlantSim Unit #4
Furnace Specifications
Air and Flue Gas System
Fuel System
Water-Steam Circut
Electrical System
Control System / Alarms
PlantSim Unit #1
PlantSim Unit #2
PlantSim Unit #3
Customization Options

Electrical System

The electrical system model includes the major loads on the 6.9kV busses; specifically, the motors for circulating water pumps, pulverizers, FD and ID fans, auxiliary cooling water pumps, condensate pumps, LP heater drain pump, primary air fans, gas recirculation fan, and standby boiler feed pumps. A breaker accomplishes generator synchronizing. All modes of synchronizing, i.e., manual, digital synchronizer and load control, and computer, are included. The excitation system model includes manual and automatic control of field current. Reverse power trip logic is also modeled. The electrical system is interfaced with the emulated operator interfaces for the DCS HMI and hard panel.

During electrical system simulation, expected changes in voltage, current, active and reactive power throughout the system can be seen when breakers are closed or opened, motor loads are changed, generator is synchronized, and excitation and turbine power are controlled. Generator load angle (i.e., the phase angle of the generator induced emf relative to the generator terminal voltage- not available in plant instrumentation) is also calculated by the model. This can be monitored to understand the generator dynamics as the load and excitation are changed.